A modern renovation paint for performing base and surface paint coatings inside buildings. It is intended for painting very dirty surfaces of walls and ceilings covered with hard to remove nicotine, soot and dry stains left after water patches. It can be used for painting of all mineral substrates (such as cement renders, cement-lime renders, lime and gypsum renders and plasterboards) and those covered with well-set plastic-based renders/plasters. Absorbent or chalking substrates should be primed with BUDOGRUNT WG or AQUALIT base coat before applying the paint.

  • icon
  • icon
  • icon
  • icon
  • icon
Base binder:specially modified alkyd binder;
Pigments:titanium white;
The content of volatile organic compounds VOC:cat. A/a. The product contains less than 30 g/l VOC;
Density:approx. 1.30 g/cm³;
Thinner:water;
Colour:white;
Gloss level:matt;
Average coverage:approx. 0.20 l/m² (with double painting on a smooth substrate);
Temperature of application (air and substrate): from +5°C to +25°C;
Relative air humidity:≤80%;
Resistance to wet scrubbing:class II paint (according to PN-EN 13300 standard) and class I paint (according to PN-C-81914:2002 standard).
Packaging:Disposable plastic packaging containing 1 litre of product.
Storage:The product should be stored in sealed packaging, in a cool room, but protected against direct sunlight and frost. Note: The product must be kept out of the reach of children.
Shelf life:12 months from the date of production printed on the packaging, with originally sealed packaging.

• Efficiently isolates even the most persistent stains and dirt
• High resistance to washing off and scrubbing
• For mineral and painted substrates

SUBSTRATE PREPARATION: The substrate should be sound/stable (without cracks and scratches), degreased and dry. In case of fungi growth, the substrate should be cleaned mechanically and then disinfected with fungicidal agent for interiors. Any loose layers, not bound to the substrate (e.g., loose render or flaked coatings), should be removed. The remnants of adhesive or lime paints should be thoroughly removed and the substrate should be washed with water. Old and/or dirty substrates should be washed and degreased with water and CLEANFORCE cleaning agent. For particularly uneven substrates, first use KOMBI FINISZ filling compound, and then smooth out the whole surface with PROFINISZ smoothing compound.
PRIMING: Absorbent or dusty (strongly chalking) substrates should be primed with BUDOGRUNT WG. Prime gypsum or heterogeneous substrates with AQUALIT primer. Drying time for the product applied on a substrate or primer is about 3 hours under optimum weather conditions (temperature +20°C and relative humidity of 55%). Note: Substrates with low wettability (such as plastic-based renders or dispersion paint coatings) should not be primed and should be only washed with water and the CLEANFORCE product.
APPLICATION: The packaging contains a ready-to-use product. Do not dilute when used to block stains. Mix the product thoroughly directly before application. The paint should be applied on the substrate in 1 or 2 layers (depending on the level of soiling) with a brush, roller or by spraying (including also “airless” method). It is recommended to use a fleece paint roller with a bristle length of 18 mm. The second layer should be applied only after the fi rst one dries completely, i.e. after min. 3-4 hours. Then, the whole surface should be painted with MILAMAT paint or other paint for interiors from KABE range. If the whole surface is painted with MILAMAT, it can be diluted by adding a small amount of water (adding max. 10% by vol.).
DRYING: Typical drying time for one layer of paint applied onto a substrate is approx. 3 hours (at air temperature +20°C, 55% RH). The total drying time is 4-6 hours, depending on the paint consistency and substrate water absorbency. Note: At low temperatures and high air humidity, the paint drying time will be longer. After painting, closed rooms should be ventilated until the specific smell disappears. The coating obtains its full mechanical and functional properties
after 4 weeks.
USEFUL HINTS: In order to avoid colour differences, it is necessary to create a surface constituting a separate architectural whole in one work cycle with material from the same production batch. Paint application and drying should take place at temperatures over +5°C. Tools should be cleaned with water immediately after finishing work.